Hydraulic Calculation Worksheet
Node-by-node water demand calculation for fire sprinkler & hydrant / standpipe systems, using the Hazen–Williams friction-loss method referenced by NFPA 13 and NFPA 14.
Project Information
Water Supply Data (from flow test or utility letter)
System Nodes, Pipe & Fitting Data
| Node ID | Type | Feeds From (Parent) | Elevation (ft) | K-factor / Fixed Demand | Min. Pressure (psi) | Pipe Length (ft) | Material | Nominal Size | Actual I.D. (in) / C | Fittings (qty) 90°Elb · Tee · Gate · Check |
Extra Equiv. Len. |
|---|
Enter one Source node (the water-supply connection point, no parent). All other nodes reference a parent node — the pipe fields describe the segment running from that node up to its parent, in the direction water flows. Pick Custom under Material/Size to type an exact C-factor and internal diameter (recommended for copper tube, CPVC and manufacturer-listed pipe — verify against the manufacturer's listed dimensions).
Hydraulic Calculation Report
Summary
Nodal & Piping Diagram
Node-by-Node Hydraulic Calculation (remote point → source)
Flow at a node is combined with adjoining branches using the standard NFPA balancing method for tees/junctions at differing pressures: Qadj = Q × √(Pcontrolling / Pbranch), then summed. Fitting equivalent lengths shown are typical Schedule 40 steel, C=120 reference values — confirm against the fitting-equivalent-length table in the edition of NFPA 13 adopted by your Authority Having Jurisdiction (AHJ) before finalizing a stamped calculation.
